How to Read an Injection Molding Quote
What should be in an injection molding quote, why quotes differ, and how to compare tooling and part price on the same basis.
An injection molding quote is not one number. It is a set of assumptions about tooling, material, cavitation, cycle time, packaging and logistics. If the assumptions are hidden, the price cannot be compared.
What a complete quote should show
| Line item | What to check |
|---|---|
| Tooling | Steel, cavitation, hot runner, spare parts, ownership |
| Part price | Material, cycle, cavitation, scrap rate |
| MOQ | Per color, per size, per order |
| Samples | T1/T2 cost and lead time |
| Packaging | Bag, box, pallet, labeling |
| Logistics | Incoterms, freight, duties |
| Payment | Deposit, balance, tooling terms |
Why quotes differ
Different quotes often use different assumptions: cavitation, cycle time, material grade, scrap rate, packaging and freight. A lower part price may hide a higher tooling cost or a slower cycle.
- Cavitation and machine tonnage
- Material grade and regrind policy
- Cycle time and automation
- Packaging and inspection level
- Freight and duty assumptions
What to send for an accurate quote
Send the part, the volume and the market. The quote is only as good as the input.
- STEP/IGES and 2D drawing
- Material and color
- Annual volume and order pattern
- Cosmetic and assembly requirements
- Destination market and Incoterms
Next steps: use the injection molding RFQ checklist to prepare your files, review the main injection molding cost drivers, or request an injection molding quote.
Frequently asked questions
Why is tooling quoted separately?
Why does the part price change with volume?
Are tariffs and freight included?
How can I get a faster quote?
Need help with this project?
Send your part, material and volume. We will review feasibility and next steps.
What to send for an injection molding quote
To quote accurately, send a 3D CAD file (STEP, IGES, STL, X_T or SolidWorks), 2D drawings with tolerances, the plastic material or performance requirement, annual and lifetime volume, surface finish and color, assembly or packaging requirements, and the target market. If you already have a mold, include its cavity count, dimensions, weight and current location.
Our team reviews DFM, tooling status, machine tonnage, cycle time, secondary operations and shipping assumptions. We reply within 24 hours on business days and provide a written quotation with assumptions stated.