China Tooling Support + Cambodia Plastic Injection Molding Production
Mold design and manufacturing support from our Shenzhen team, combined with plastic injection molding production at our Cambodia factory.
For an OEM plastic manufacturing program, tooling development and mass production need to be planned together. Mold design, machine compatibility, resin selection, part geometry, cycle time, finishing and inspection all affect the final production result.
Everest Plastic Mold provides China Tooling Support from Shenzhen, China, while injection molding production is based in Kampong Speu, Cambodia.
Mold Design and Manufacturing Support
Our Shenzhen team provides mold design and manufacturing support. Depending on the agreed scope, this includes mold design coordination, DFM review, tooling development, mold trial planning and technical support.
Injection molding production, secondary operations and assembly are handled at the Everest factory in Kampong Speu, Cambodia. The two locations work as one team, not as separate suppliers.
For related technical details, see mold making in Cambodia and Vietnam, DFM review, T1/T2/T3 samples and the mold transfer checklist. For more on the Shenzhen tooling team, visit JR Mold.
How the operating model works
Tooling and engineering support in Shenzhen, China
China Tooling Support covers the tooling scope identified for Everest projects. Depending on the agreed scope, this may include mold design coordination, DFM review, tooling development, mold trial planning and technical support.
Injection molding production in Cambodia
After the mold and production requirements are reviewed, the project may proceed to injection molding production at Everest’s Cambodia facility, subject to machine compatibility, mold condition, material availability and production planning.
Secondary operations and assembly
Where confirmed for the project, additional operations may include painting, printing, welding, assembly, inspection and packing. The project quotation should identify which processes are performed at the Cambodia facility and which are handled by an external supplier.
Existing mold transfer
Customers with existing molds should provide mold drawings, dimensions, weight, cavity count, machine history, photographs, maintenance records and sample parts. Everest will review the mold’s condition and compatibility before confirming a transfer plan.
Important commercial and technical points
Before production begins, both parties should document:
- Mold ownership
- Tooling payment milestones
- Mold maintenance and repair responsibility
- Mold storage and access
- Trial and sample approval criteria
- Production location
- Material and process specifications
- Quality inspection plan
- Packaging and shipment terms
- Mold export or transfer arrangements
The model combines China Tooling Support with Cambodia plastic injection molding production. The exact production route and responsibilities are confirmed for each project.
Request a tooling and production review
Send the part CAD file, drawing, resin, annual volume, mold status and target market. We can identify the information required to review tooling and production suitability.
Frequently asked questions
How does China Tooling Support work with Cambodia production?
Where is China Tooling Support located?
Can I transfer an existing mold from China to Cambodia?
Who owns the mold?
Review your tooling and production plan
Send the part CAD, drawing, resin, annual volume, mold status and target market.