Mold Transfer Checklist: China to Cambodia
A practical checklist for transferring an existing injection mold from China to Cambodia for production.
Mold transfer is a supply-chain project, not just a shipping task. The goal is to keep the same part, the same quality and a known production window after the mold moves.
Before the mold leaves China
Review the tool before packing. A mold that is already worn, modified or missing documentation will create problems in Cambodia.
- 2D part drawing and 3D model
- Mold drawings, cavity layout and water diagram
- Steel certificates and insert details
- Hot runner controller and spare parts
- Last process sheet and T1/T2 report
- Known defects and repair history
Shipping and customs
Molds are heavy, precise and sensitive to rust. Packing and Incoterms should be agreed before pickup, not after the mold reaches the port.
- Clean, dry and apply rust preventive
- Protect parting surfaces and ejector pins
- Use a sturdy crate with shock indication
- Agree Incoterms and insurance
- Prepare commercial invoice and packing list
T1 and validation in Cambodia
| Stage | Check |
|---|---|
| Mold installation | Water, electric, hot runner and safety |
| T1 | Fill, cosmetic, dimensions and ejection |
| Correction | Repair or adjust before T2 |
| Validation | Process window, inspection and packaging |
| Production | Golden sample and maintenance plan |
Tooling support
China Tooling Support is provided from Shenzhen, China. Everest Plastic Mold runs the mold in Cambodia and handles molding, assembly and export.
Frequently asked questions
Can any mold be transferred?
Who owns the mold?
How long does a transfer take?
Do you support molds made by another supplier?
Need help with this project?
Send your part, material and volume. We will review feasibility and next steps.