Everest Plastic Moldadmin@everestplasticmfg.com

Mold Transfer Checklist: China to Cambodia

A practical checklist for transferring an existing injection mold from China to Cambodia for production.

Mold transfer is a supply-chain project, not just a shipping task. The goal is to keep the same part, the same quality and a known production window after the mold moves.

Before the mold leaves China

Review the tool before packing. A mold that is already worn, modified or missing documentation will create problems in Cambodia.

  • 2D part drawing and 3D model
  • Mold drawings, cavity layout and water diagram
  • Steel certificates and insert details
  • Hot runner controller and spare parts
  • Last process sheet and T1/T2 report
  • Known defects and repair history

Shipping and customs

Molds are heavy, precise and sensitive to rust. Packing and Incoterms should be agreed before pickup, not after the mold reaches the port.

  • Clean, dry and apply rust preventive
  • Protect parting surfaces and ejector pins
  • Use a sturdy crate with shock indication
  • Agree Incoterms and insurance
  • Prepare commercial invoice and packing list

T1 and validation in Cambodia

StageCheck
Mold installationWater, electric, hot runner and safety
T1Fill, cosmetic, dimensions and ejection
CorrectionRepair or adjust before T2
ValidationProcess window, inspection and packaging
ProductionGolden sample and maintenance plan

Tooling support

China Tooling Support is provided from Shenzhen, China. Everest Plastic Mold runs the mold in Cambodia and handles molding, assembly and export.

Frequently asked questions

Can any mold be transferred?

Most can, but the tool should be reviewed first. Condition, steel, hot runner, spare parts and documentation all affect the transfer plan.

Who owns the mold?

Ownership should be written in the tooling agreement. Many buyers own the mold and pay for maintenance; the supplier runs it.

How long does a transfer take?

It depends on mold condition, shipping method, customs and T1 results. Plan the transfer before the old supply window closes.

Do you support molds made by another supplier?

Yes, after a mold review. We check drawings, steel, cavity layout, cooling, ejection and spare parts before quoting.

Need help with this project?

Send your part, material and volume. We will review feasibility and next steps.

Request a quote All Technical Tips