Leadership
Andrew Liu
Factory Manager
Andrew manages the Cambodia factory floor, including injection molding, tooling transfer, process setup and production ramp-up. He works on DFM, mold trials, runner design, overmolding and defect troubleshooting.
Andrew reviews drawings and samples for DFM before tooling, then runs T1/T2/T3 trials and production ramp-up on the Cambodia floor. He also handles mold transfers from China, including inspection, setup and process tuning on 80T–1000T machines.
Areas of expertise
- Injection molding process
- Mold transfer
- DFM
- Hot runner
- Overmolding
- Factory operations
Factory facts
- 16 injection molding machines, 80T–1000T
- 200,000+ molded parts per month
- Sedex SMETA 4-Pillar and FCCA audited
- Tooling from Shenzhen, production in Kampong Speu, Cambodia
Articles by Andrew Liu
- Injection Molding Materials
- Mold Making in Cambodia & Vietnam
- DFM for Injection Molding
- Injection Molding Defects
- Mold Transfer Checklist
- Overmolding vs Insert Molding
- Hot Runner vs Cold Runner
- T1, T2 and T3 Mold Samples
- Injection Molding vs 3D Printing
- Injection Molding vs CNC Machining
- Injection Molding vs Vacuum Forming
- Helmet Injection Molding
- Protective Case Injection Molding
- Electronics Enclosure Injection Molding
- Battery Cover Injection Molding
- Takedown Tool-E - OEM Precision Injection Molding: Crafting Quality Products for Global Clients
- Inside Our Cambodia Factory: A Complete Tour of Everest's Injection Molding Operations
- Everest Plastic Mold Introduces Dual-Finish Coating: Rubber Oil + UV Paint for Diverse Surface Finishing Needs
- Made to Fit, Built to Protect: Everest's Complete Guide to Custom Protective Cases
Contact the team
Need support on a similar program? Contact our team with the part, material, annual volume and target market.
Request a quote