T1, T2 and T3 Mold Samples: What Buyers Should Expect
What T1, T2 and T3 mean, what to inspect at each stage, and how to approve a mold for production.
T1, T2 and T3 are trial stages, not marketing labels. Each stage answers a different question: can the mold fill, can it meet the drawing, and can it run consistently?
What each stage means
| Stage | Purpose | What the buyer reviews |
|---|---|---|
| T1 | First trial after tool build | Fill, short shots, flash, ejection, major dimensions |
| T2 | After corrections | Cosmetics, critical dimensions, assembly fit |
| T3 | Pre-production validation | Process window, repeatability, packaging |
What to inspect at T1
T1 is about whether the tool works, not whether it is perfect. Expect some cosmetic and dimensional issues; the goal is a clear correction list.
- Fill balance across cavities
- Short shots, flash and weld lines
- Ejection marks and sticking
- Critical dimensions and fit
- Gate, runner and venting condition
Approving the mold
Do not approve on a single good sample. Approve when the process window is documented, the inspection report is complete and the golden sample is signed.
- Signed drawing and cosmetic standard
- Dimensional report with critical dimensions
- Process sheet and cycle time
- Golden sample and limit samples
- Maintenance and spare-parts list
Frequently asked questions
How many samples do I get?
The quantity depends on the part and test plan. Typically T1 covers mold validation and T2/T3 cover dimensional, assembly and cosmetic approval.
Can I attend the trial?
Yes, or we can arrange a live video review with measurements and photos.
What if T1 fails?
We issue a correction list, repair or modify the mold, then run T2. The key is to document what changed.
How do I approve the mold?
Approve against the drawing, cosmetic standard, dimensional report, process sheet and signed golden sample.
Need help with this project?
Send your part, material and volume. We will review feasibility and next steps.